Kashmir Indepth
Kashmir

Power Shutdown in Srinagar on December 24 & 26 for Maintenance Work

Srinagar, Dec 23 (KINS): The Chief Engineer of the Kashmir Power Distribution Corporation Limited (KPDCL) has announced a scheduled power shutdown in parts of Srinagar to facilitate minor repairs and the replacement of damaged equipment.
As per the notice, the 220/132 KV Transformer Bank-I at Grid Station Pampore, along with the 132 KV ICT Ckt-I, will remain shut down on December 24, 2024, from 11:00 AM to 01:00 PM. The shutdown is necessary to carry out repairs, including the replacement of damaged clamps and conductors in the 132 KV Bays of Transformer Bank-I & II and the 132 KV ICT Ckt-I.
Additionally, the 220/132 KV Transformer Bank-II of Grid Station Pampore will be shut down on December 26, 2024, from 11:00 AM to 01:00 PM for further maintenance.
Consumers in the affected areas are advised to take note of the power outages during these times.(KINS)

Related posts

Mysterious blast in Anantnag, one injured

Kashmir Indepth

CEO SSCL inspects Goni Khan Market; Directs swift resolution of Civic Issues

Zainab Hamdani

BjP leader , His Father, Brother Shot Dead In Bandipora

Kashmir Indepth

Rajbagh youth booked under PSA, shifted to Jammu jail

Kashmir Indepth

Radio Mirchi Kashmir gets IRF award for best debut station

Kashmir Indepth

Srinagar Records Coldest Night Of Season, Pahalgam Drops To -3.4 Degrees Celsius

Ankit Sharma

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy